GottaLoveFlying
GottaLoveFlying
35 / 3
27th June
22nd September
A boiling water reactor, designed to handle DBAs for at least 10 minutes without operator action | Give it a couple minutes to stabilize after loading in | AFW, RCIC unfinished, LOGIC IS A PAIN
complex reactor logic boiling water uranium nuclear uran

Comments

  • GottaLoveFlying
    GottaLoveFlying
    23rd September
    trying to work out a containment vent system
  • GottaLoveFlying
    GottaLoveFlying
    22nd September
    actually ima keep both but just make high temperature scram take a lot longer
  • GottaLoveFlying
    GottaLoveFlying
    22nd September
    i might swap out the extended high temperature scram to just relief valve actuation scram
  • GottaLoveFlying
    GottaLoveFlying
    12th September
    prob will add relief valve controls soon
  • GottaLoveFlying
    GottaLoveFlying
    12th September
    increased relief valve capacity for an atws
  • GottaLoveFlying
    GottaLoveFlying
    11th September
    also msiv done
  • GottaLoveFlying
    GottaLoveFlying
    11th September
    like 4 pixels of emp shouldnt cause this to melt
  • GottaLoveFlying
    GottaLoveFlying
    11th September
    idk why but i made it resistant against small emps
  • GottaLoveFlying
    GottaLoveFlying
    8th September
    broke something
  • serialox
    serialox
    5th September
    boring i just explode it very fun